aboutsummaryrefslogtreecommitdiff
path: root/docs
diff options
context:
space:
mode:
Diffstat (limited to 'docs')
-rw-r--r--docs/pva.md39
1 files changed, 29 insertions, 10 deletions
diff --git a/docs/pva.md b/docs/pva.md
index 7ec8a50..8621fd8 100644
--- a/docs/pva.md
+++ b/docs/pva.md
@@ -13,28 +13,36 @@ Zigbee has been on the market for some time, being used in products such as the
In the project we use a mesh network to realize a home automation system.
# Project result
-
+In year 2 of avans hogeschool blok 2 is the project is domitica. With this project we are going to realise a domotica system using bluetooth mesh.
## Problem analysis
-
+Most household don't have a domitica system. The ligtswitches turn the light on by a physical connection and can only do that, But with a domitica system this can by solved.
## Issue
-
+The question arises, why there isn't more households that uses a domotica system? The answer to that question is, The system is for most people confusing, But with the right explenation and easy-to-use can everyone have a domotica system in their household.
## Objective
-
+Our objective is to make a working domotica system with the use of bluetooth mesh. the system consists of minimal three sensors and three lights that comminicate in a mesh network. This can then by implemented in a household.
## Final result
-
+With our domotica system that is user friendly and easy-to-use everybody can make their house a domotica system
# Phasing
+For project casaDomitica are we using scrum as our tool for planning.
## Description phases
+There are different steps were taking for this project. The first step is Plan van Aanpak also know as Plan. Then were describing the requirements. After the requirments comes our sprints. there are a total of three sprints were doing this project.
+
### Plan
+For the planning and our actions see our trello bord with this link.
+
+### Requirements
-### To demand
-### Design
+### Sprint 1
+In this sprint were mostly doing research about different subjects of domitca. Additionally, are we testing the different subjects to further understand domitca. For exaample, researching and testing bluetooth mesh.
-### Manufacture
+### Sprint 2
+In this sprint were using the knowlodge of sprint 1 to start building our domitica system. Also, if further research is needed this sprint can be used for this.
-### Qualification
+### Sprint 3
+In this Sprint were finishing the domitca system if finishing is needed. Most of the time is needed for testig and debugging.
# Quality
@@ -51,7 +59,7 @@ In the project we use a mesh network to realize a home automation system.
- Design documents will be proofread by peers to verify if the explanation is comprehensible.
# Confidentiality
-
+This project is MIT licensed.
# Project organization
## Organization
@@ -90,3 +98,14 @@ While the roles in the table above describe a hierarchial system, all planning a
As mentioned before, we're using Trello for managing a scrum-based planning. The user stories are scheduled a week before the sprint assessment by default. For a detailed up-to-date version of the schedule, see [Trello].
# Project boundaries
+The project has a few bounderies. The minimal requirements is that is works with three switches and three lights. Therefore using our domitica system for relaying numeric values is not possible, for now atleast. additionally, it is an domotica system which means it cannot be used in a industrial environment. And the last bounderie, Is the system needs to use our GUI and does not work with other GUI.
+# Cost-benefit
+
+## Risks
+
+### Technical risks
+
+### Project management risks
+
+### Measures
+